Proposed Blaine Fuel Station Aims to Ease Marine Logistics
Local marine operators may gain an in-water fuel source if $2.8 million in federal funding is approved for the harbor project.
Updated on Oct. 15, 2026 in Utilities

Live Poll
Do you believe government-funded infrastructure projects are the best way to support your local economy?
U.S. Representative Rick Larsen met with Port of Bellingham officials in Blaine to discuss federal funding for a new in-water fueling station. The project aims to improve operational efficiency for local fishing operators currently forced to haul fuel manually to the harbor.
Why it matters
The lack of an in-water fuel source creates logistical bottlenecks for marine businesses, as crews currently transport fuel from a land-based station. Securing federal funding is a critical hurdle for the port as it balances infrastructure needs against the $28 million cleanup cost of the Westman Marine site.
Port of Bellingham officials are seeking $2.8 million in 2027 federal spending for a new fueling center while managing a $28 million Westman Marine cleanup. The port aims to cover 50% of that cleanup cost through state funding.
The players
Rick Larsen
U.S. Representative for Washington's 2nd Congressional District overseeing federal funding requests.
Port of Bellingham
The local port authority managing harbor infrastructure, marine terminals, and environmental cleanup projects.
Drayton Harbor Oyster Company
A local aquaculture operator that relies on daily vessel operations and currently manages manual fuel transport.
The details
Currently, local operators like Drayton Harbor Oyster Company must manually transport fuel from land-based stations on Peace Portal Drive to their vessels. The proposed in-water station is designed to eliminate this labor-intensive process, while the concurrent Westman Marine cleanup project serves as a major harbor revitalization effort. Federal support for the station is tied to the submission of a verified development plan by port leadership.
Timeline
October 9, 2026: U.S. Representative Rick Larsen visited Blaine Harbor.
November 2026: Washington's 2nd Congressional District election takes place.
2027: Federal spending bills are expected to include the funding request.
Fall 2027: The Port of Bellingham hopes to begin the Westman Marine cleanup.
Market Landscape
The proposed infrastructure upgrades follow a pattern of regional harbor revitalization efforts aimed at modernizing maritime logistics. These projects are currently heavily dependent on inclusion within the 2027 federal spending bill process to move from development planning to construction.
Marine operators should track the 2027 federal budget cycle as a signal for potential equipment and procurement shifts. Businesses currently relying on manual land-based fuel hauling should review their logistics costs in anticipation of a potential change in harbor utility access.
The takeaway
The proposed station represents a significant shift toward centralized harbor logistics for local fishing fleets. Operators should watch for the release of the final 2027 spending bill to confirm if the $2.8 million appropriation for the fueling station is secured.
Further reading
For more on infrastructure developments, visit the Utilities section.
Source note: This article includes information reported by The Northern Light.
Live Poll
Do you believe government-funded infrastructure projects are the best way to support your local economy?







