Nutt Hill Tubing Run Slope Reduced in Plymouth
Nonprofit operators completed a renovation of the 550-foot tubing attraction to improve safety and sightlines.
Updated on Oct. 13, 2026 in Philanthropy

Live Poll
Do you find that local winter recreation facilities provide enough value for your community?
Cheese Capital Winter Park completed regrading work on its Nutt Hill snow tubing run in summer 2026. The renovation adjusted the site's primary slope to improve the visitor experience.
Why it matters
The project aimed to enhance safety and attraction performance by moderating the run's grade and implementing erosion controls. Operators managing outdoor recreation assets can look to this shift as a means to manage risk and streamline maintenance.
The 550-foot tubing run now features a 24% maximum grade, down from its original 33% steepness. These infrastructure changes, managed by the 501(c)(3) nonprofit Cheese Capital Winter Park, include new vegetation planted to mitigate runoff.
The players
Cheese Capital Winter Park
A 501(c)(3) nonprofit organization that operates outdoor recreational assets in Plymouth.
The details
Engineers implemented a grading plan using excavation to balance acceleration and deceleration across the 550-foot run. The redesign also improved visibility from the top of the hill to increase patron safety. To support long-term site stability, the board added vegetation to manage water runoff and reduce erosion.
Timeline
Summer 2026: Regrading and improvement work was completed.
October 17, 2026: Squirrel Fest fundraiser occurs from noon to 6 p.m.
Market Landscape
This infrastructure upgrade follows industry patterns for enhancing site safety and accessibility, aligning with broader standards for recreational facility management. The project serves as an example of how nonprofits prioritize site improvements to maintain competitive site appeal.
Operators of outdoor venues should monitor how physical site upgrades affect liability insurance premiums and visitor volume. The upcoming fundraiser provides a benchmark for evaluating community engagement strategies at mission-driven recreation sites.
The takeaway
Large-scale infrastructure shifts can significantly change the operating profile of an outdoor attraction by reducing slope-related risks. Operators should track the conversion rate of their seasonal fundraisers, such as the upcoming Squirrel Fest, to fund future capital maintenance.
What happens next
The organization has scheduled the Squirrel Fest fundraiser for October 17, 2026, to secure capital for future site enhancements.
Further reading
For more on managing donor-funded capital improvements, see our coverage of Philanthropy.
More information
Visit the purchase tickets for wine and cheese pairing to view park updates.
Source note: This article includes information reported by The Reporter.
Live Poll
Do you find that local winter recreation facilities provide enough value for your community?







