EU Opens Electricity Market Model to Public Review
Utilities and market participants can comment on EU-Flex before its assumptions shape the July 2027 flexibility assessment.
Updated on Nov. 5, 2026 in Utilities

The EU energy regulator ACER has published a preliminary version of EU-Flex, an open-source model that simulates the European electricity market. The model is shared ahead of the first EU flexibility needs assessment planned for July 2027, with stakeholder input accepted until 17 December 2026.
Why it matters
Under the EU's 2024 Electricity Market Design reform, ACER is tasked with estimating flexibility needs across the EU. Growing renewable generation and expanding electrification across sectors increase the bloc's need for flexibility, making the methodology behind future assessments consequential for market participants.
The stakeholder consultation window runs from the 5 November 2026 release to 17 December 2026, and the first flexibility needs assessment is scheduled for July 2027. The release bundles a short introductory paper with a test case, preliminary source code, test input data, and a methodology document.
The players
Agency for the Cooperation of Energy Regulators (ACER)
The EU body that coordinates national energy regulators and sets market rules for the bloc's electricity and gas markets, now tasked with assessing EU-wide flexibility needs.
The details
EU-Flex simulates the European electricity market as an open-source tool, so the methodology and code are visible to outside parties. Stakeholders can comment on the accompanying paper and methodology through ACER's public consultation, and they can comment on the preliminary model directly through the agency's GitHub repository. Publishing the model ahead of the 2027 assessment is intended to make the analysis more transparent.
Timeline
2024: The EU Electricity Market Design reform assigned ACER its flexibility assessment task.
5 November 2026: ACER published the preliminary EU-Flex model.
17 November 2026: ACER holds a webinar presenting the model.
17 December 2026: Deadline for stakeholder views on the paper, methodology, and model.
July 2027: First EU flexibility needs assessment planned.
Market Landscape
The 2024 Electricity Market Design reform gave ACER the flexibility assessment role, and EU-Flex is the modeling tool it is building to fulfill that mandate. Publishing the model openly before the first assessment in July 2027 is a departure from closed analytical processes in regulatory modeling.
Energy operators and market participants should review the EU-Flex methodology and test case before the 17 December 2026 deadline if they want to influence how flexibility needs are measured. Those whose planning depends on EU-wide flexibility assumptions should track the July 2027 assessment as a potential input to future market design decisions.
The takeaway
The open release of EU-Flex means the modeling assumptions behind future flexibility assessments can be examined before they are used. Energy businesses should calendar the 17 December 2026 comment deadline and read the methodology document, since its assumptions will shape the July 2027 assessment.
What happens next
17 November 2026: ACER webinar presenting EU-Flex. 17 December 2026: Deadline for stakeholder input. July 2027: First EU flexibility needs assessment.
Further reading
For background on how grid and market rules are shaped, see the Utilities section.
Source note: This article includes information reported by Europa.


