Bangladesh Eyes Turkish Waste and Leather Know-How
Leather and industrial waste operators should track whether these visits turn into formal technology-transfer or training agreements.
Updated on Nov. 6, 2026 in Manufacturing

Live Poll
Should your city invest public money in waste-to-energy incinerator plants?
Bangladesh's Commerce and Industry Minister Khandakar Abdul Muktadir toured several facilities in Istanbul on November 4 and 5, 2026, seeking Turkish technical cooperation in waste-to-energy and leather industry modernization. The visits matter to manufacturers and industrial operators weighing waste-treatment and tanning-sector upgrades.
Why it matters
Bangladesh is looking to Türkiye's experience turning urban and industrial waste into electricity and modernizing its leather industry, two areas where waste handling and production efficiency directly affect factory operating costs. The visits signal a government push to build technology and training partnerships rather than purchase equipment alone.
The İSTAÇ facility handles 3,000 tonnes of household waste per day and runs 85 megawatts of installed generation capacity. The Energram facility in Şile treats 33,000 tonnes of hazardous industrial waste a year through thermal processes, with 5.6 megawatts of installed capacity.
The players
Istanbul Metropolitan Municipality
The municipal government of Türkiye's largest city, which oversees the İSTAÇ waste incineration and power generation plant as part of its integrated waste management system.
Cevahir Leather Industry and Trade Company
A Turkish leather manufacturer whose factory the Bangladeshi minister visited to observe the conversion of raw hides into finished leather.
The details
The Energram facility operates under a build-operate-transfer arrangement within İSTAÇ's integrated waste management framework, meaning a private operator runs the plant for a set period before ownership passes to the public authority. At the Cevahir factory, the minister observed the stages of converting raw hides into finished leather, the process at the center of Bangladesh's interest in modernizing its tanning sector. The stated goal is to draw on Türkiye's experience generating electricity from urban and industrial waste.
Timeline
November 4, 2026: Minister visited the İSTAÇ waste plant, the Istanbul Leather Organised Industrial Zone in Tuzla, and the Cevahir factory.
November 5, 2026: Minister visited the Energram thermal disposal facility in Şile.
November 6, 2026: Ministry of Commerce issued a press release about the visits.
Market Landscape
Bangladesh's outreach follows a pattern of emerging-market governments studying Turkish municipal and industrial infrastructure models for transferable know-how. Istanbul's integrated waste framework, with its build-operate-transfer arrangement, is the specific model under examination here.
Manufacturers in leather and industrial waste-heavy sectors should track whether Bangladesh moves from visits to signed technology-transfer or training agreements, since those would shape future input and compliance costs. Operators in these sectors should watch for any published cost or timeline details before drawing conclusions about how the arrangements would affect their operations.
The takeaway
The key operating signal is that Bangladesh is pursuing knowledge transfer on waste-to-energy and tanning modernization rather than only equipment purchases. Industrial operators should monitor whether these discussions produce formal cooperation agreements, training programs, or published project timelines in the coming months.
Further reading
For broader context on how factories and industrial plants are adapting their production and operations, see the Manufacturing section.
Live Poll
Should your city invest public money in waste-to-energy incinerator plants?





