On-Site Metal Parts Could Cut Lead Times
Operators relying on OEM components can compare on-site additive production against current procurement costs and delays.
Updated on Nov. 7, 2026 in Manufacturing

Snowbird Technologies, a Jacksonville, Florida manufacturer, demonstrated on-demand metal additive manufacturing aboard the USS Essex and at Schofield Barracks during RIMPAC 2026. Its analysis found four of seven components offered cost advantages over original equipment manufacturer procurement.
Why it matters
Producing parts on site rather than waiting on centralized suppliers targets procurement delays that can stretch to hundreds of hours for a single order. The approach is designed to reduce dependence on conventional supply chains, a concern for manufacturers serving defense and other time-sensitive customers.
Snowbird's company-reported figures show seven components produced during the exercise, with four of them costing less than OEM procurement. One order of twelve oxygen tank brackets took an estimated 75 hours at roughly US$2,492, against estimated procurement costs of US$9,624 to US$10,224, while the company's analysis put avoided procurement time at about 692 hours for one part order.
The players
Snowbird Technologies
A Jacksonville, Florida manufacturer of mission-critical equipment and deployable manufacturing systems, offering on-demand production capabilities.
USS Essex
A U.S. Navy amphibious assault ship that hosted the shipboard portion of the demonstration during RIMPAC 2026.
The details
The platform used the Meltio Engine Blue wire-laser metal additive manufacturing system, with nitrogen as the process gas, under the NPS CAMRE and FLEETWERX initiatives. After shipboard operations, manufacturing continued at Leader's Field in Schofield Barracks, where an on-site nitrogen generator supplied the process gas. The company says the broader opportunity lies in linking digital part files with manufacturing, machining, inspection and sustainment capabilities.
Timeline
RIMPAC 2026: Snowbird demonstrated expeditionary manufacturing during the exercise, with production continuing afterward at Schofield Barracks.
Market Landscape
The demonstration places wire-laser additive manufacturing, using the Meltio Engine Blue system, into shipboard and forward-base use rather than fixed plants. It is positioned against conventional supply chains that depend on centralized production facilities and original equipment manufacturers.
Operators who rely on OEM parts with long lead times should evaluate whether on-site or near-site additive production could shorten procurement cycles for select components. Procurement and maintenance teams should compare total cost, including material, gas and machine time, against quoted OEM prices before changing sourcing.
The takeaway
Treat the reported savings as company-supplied figures and request independent verification before relying on them for sourcing decisions. Compare any on-site production option's material, gas and labor costs against your current OEM and supplier quotes, and consult qualified contract or procurement counsel before changing vendor arrangements.
Further reading
For more on how production is changing, explore Manufacturing coverage across the United States.




