New Rocket Motor Facility Opens in Camden to Cut Lead Time
The 60,000-square-foot plant will double production capacity, helping defense manufacturers reduce assembly bottlenecks.
Updated on Oct. 20, 2026 in Manufacturing

Live Poll
Should the federal government prioritize expanding domestic production capacity for defense systems?
L3Harris has officially opened a new 60,000-square-foot facility in Camden, Arkansas, to scale up production of solid rocket motors. The site aims to double manufacturing capacity for the Guided Multiple Launch Rocket System (GMLRS) as industry demand continues to climb.
Why it matters
The investment targets a critical bottleneck in defense supply chains by doubling production capacity for GMLRS motors. This expansion is designed to cut current manufacturing lead times in half, addressing the sustained surge in production requirements for the system over the past few years.
The new 60,000-square-foot Camden facility is capable of outputting one rocket motor every nine minutes. This new production capacity represents a doubling of the total volume for the Guided Multiple Launch Rocket System compared to recent years.
The players
L3Harris
A global aerospace and defense technology company that provides mission-critical solutions across air, land, sea, space, and cyber domains.
Lockheed Martin
A global security and aerospace company specializing in the research, design, development, and manufacture of advanced technology systems.
The details
The facility features new production lines engineered specifically to accelerate the assembly of solid rocket motors. By integrating these dedicated lines, the plant optimizes flow to move units through the manufacturing process in half the time previously required. This specialized infrastructure allows L3Harris to meet the increased output targets set for the Guided Multiple Launch Rocket System, which is manufactured by Lockheed Martin.
Timeline
October 20, 2026: L3Harris officially opened the new rocket motor facility.
Market Landscape
The expansion reflects a broader industry-wide effort to clear supply chain backlogs for the Guided Multiple Launch Rocket System. This move follows a multi-year trend of surging production requirements that have strained legacy manufacturing capacities.
Operators in the defense supply chain should monitor whether this increase in motor production reduces lead times for downstream system integrators. Businesses involved in the assembly process should track output consistency at this site as a benchmark for potential contract scaling.
The takeaway
The addition of this 60,000-square-foot plant illustrates how Tier 1 defense contractors are de-risking supply chains by adding dedicated, high-speed production capacity. Business leaders should monitor industry lead-time reports to see if this throughput boost eases procurement delays for GMLRS components.
Further reading
For more on operational trends in the region, see Manufacturing.
Live Poll
Should the federal government prioritize expanding domestic production capacity for defense systems?







