Construction Access Limits Foot Traffic for Spokane Shops

Retailers on Post Street are adjusting customer access routes as ongoing renovations at the Peyton Building restrict the sidewalk.

Updated on Oct. 16, 2026 in Openings & Closings

A narrow sidewalk pathway runs alongside yellow construction fencing placed in front of a historic brick commercial building in an urban setting.
Construction at the historic Peyton Building in Spokane continues to restrict pedestrian access, forcing local retailers to navigate shifted customer foot traffic. AI Illustration. Upload story photo >

Live Poll

Do you believe local construction projects provide enough support to nearby small businesses?

Renovation work at the historic Peyton Building has restricted pedestrian access to local businesses on Post Street since early August 2026. Retailers and hospitality operators in the immediate vicinity are navigating shifts in customer foot traffic as construction equipment blocks traditional pathways.

Why it matters

Construction projects that limit public access can create sudden, unpredictable disruptions to established revenue flows for storefront businesses. Operators facing similar site-specific infrastructure work often find that clear, proactive communication with customers is required to maintain visibility and accessibility.

Tempus Cellars has reported a noticeable decline in foot traffic over the 6 weeks of construction at the Peyton Building, breaking an 8-year trend of steady access at its current site.

The players

Peyton Building

A historic structure in Spokane currently serving as the site for renovation work.

Tempus Cellars

A regional winery and tasting room that has maintained a retail presence in Spokane for eight years.

The details

Construction crews have occupied Post Street with heavy machinery and perimeter fencing, effectively narrowing the thoroughfare for pedestrians. To combat the loss of organic walk-in customers, businesses like Tempus Cellars have begun directing patrons to use alternative access routes via Sprague Avenue. This response underscores the operational reliance on street-level visibility and the logistical challenges of maintaining customer flow during localized infrastructure projects.

Timeline

  1. Six weeks ago: Construction began around the Peyton Building.

  2. Eight years ago: Tempus Cellars opened its current location.

Market Landscape

This development follows a common pattern where local urban infrastructure projects disrupt established customer access points for street-level retail. It highlights how businesses must adapt to changes in urban density and walkability caused by construction cycles.

Operators in areas scheduled for major renovations should proactively map secondary access routes for their customers before work commences. Businesses facing current disruptions should immediately communicate these alternative directions to their loyal client base to mitigate traffic declines.

The takeaway

Sudden changes to the local physical environment require businesses to pivot their communication strategy to preserve customer access. Review your current marketing channels to ensure you can rapidly deploy updates on store accessibility if a public or private project blocks your primary entrance.

Further reading

For more on managing disruptions to retail storefronts, see Openings & Closings.

Source note: This article includes information reported by NonStop Local KHQ.

Live Poll

Do you believe local construction projects provide enough support to nearby small businesses?